-
Construction Control / Canberra Airport Group
-
Canberra Airport
-
2019
-
Metal work
Extreme logistics working airside combined with a technical design made a for a complex little project. A tight integration with the builder and other trades is crucial to achieve quality and good details on a tight program with no staging space. Night work was a constant to avoid hold ups with in the program.
Our works started with all of the partitions / ceilings and doors before moving into glazing / Timber and our centre piece of the metal work. The metal work included the hanging screens in XO noodles and the hanging feature light in Bakers cut which we both fabricated and installed.
All our venetian plaster was completed by Render Transformations who did an amazing job.
